Showing posts with label street. Show all posts
Showing posts with label street. Show all posts

Thursday, July 24, 2014

Diverse Research Proves the Benefits of Preservation

As a family business, here at Gee, we have been conducting research on preservation products for close to 50 yrs and counting. But, as we all have observed firsthand, the asphalt industry has changed while costs have risen--and roads just don’t last as long as they used to. And, in response and under the mandate of reducing costs and sustaining vital infrastructure, many other entities (only some are listed above) have done independent research with all the same results:

The use of Preservation products can extend 2x the life of pavements and reduce overall maintenance costs.

But this research isn’t just filed away, it’s put into practice!

 While most of California’s highways are more than half a century old, they carry nearly half of the nation’s container freight. Recently the California Transportation Commission (Caltrans) initiated a “Fix It First” campaign, which includes preserving pavements that are in good condition from deteriorating. 

Caltrans Director Malcolm Dougherty reasons, “To get the most bang for the buck for taxpayers, Caltrans targets dollars where they are most effective--pavement preservation. Every $1 spent on preventive pavement maintenance saves Californians $11 that would have been spent on expensive pavement repairs.”
(Source: Central Valley Business Times / Sacramento, CA June 26th, 2014

)

Time and time again, test after test, pavements in Good Condition when treated with GSB, result in a  binder with unmatched strength–durability and bonding properties with high density–capable of preserving vital oils and flexibility in the pavement for decades of trouble free pavements and prolonged traffic load carrying capabilities! Contact us today and let us show you how we are preserving today’s infrastructure for future generations.

Monday, June 23, 2014

Interview with Derek Snead, P.E., Jones County Engineer


https://www.youtube.com/watch?v=X9U8rCEiJ4g 
We sat down with Derek to hear his professional take on the problems he and his peers face concerning aging asphalt pavements.

What are some of the current trends or changes you've seen in pavement management since you've been on duty here?

Derek – I think typically in the past there wasn't such an emphasis on shortage of funding so it was a practice of use the existing pavement 'til it's completely deteriorated (then) tear it up and put new back down. Recently the amount of existing pavement that is past its useful life is so broad and we have such a short fundage--short amount of funding--that tearing it up and repairing all the existing ones just isn't an option.

How are things different now (you touched on the limited budgets we have) and how have people dealt with roads in the past in maintenance and such? Has it been more reactive or proactive?

Derek – I would say it probably varies, but the majority of it has been reactive. When you do have a shorter budget you have some tough choices to make. A lot of times you try to use the existing pavement as long as you possibly can before replacement, and that's one way of looking at it, or the second way would be to utilize some of the existing strength of that pavement.

(Would you) say keeping a pavement flexible would be a benefit to helping survive some of the stress that's put on it?

Derek – Particularly if you have a flexible pavement like asphalt is, in order to make the life of it last longer, you want to keep it that way (flexible). It's not designed to be a rigid pavement. If it turns into one, then the lifespan of that (pavement) deteriorates.

We are a very rural community here. We have a lot grain carts, a lot of heavy equipment going back and forth on our roads. They (pavements) weren't necessarily designed for types of loads that are going over them currently. So heavy loads and weather are the two main factors in deterioration of our existing pavements.

So, we're trying as many ways to prolong the existing ones (pavements) as we possibly can. So to prolong the life of the existing pavement that we have so far, this GSB® was one solution we looked at to try to offset some of the replacement (cost) with extending the life of some of our paved roads here in the county. So far we are very happy with the product (GSB®).

Monday, April 14, 2014

Are You Wasting Money on Crack Sealant?

“Nearly every surface defect started as a crack that got out of control. Each phase the remedy gets more expensive than the last. We’re here to break that cycle and to take care of your good pavements before it’s too late!” – Gee Asphalt Systems, Inc.

Did your crack sealant make it through the winter?

Last fall, many pavement owners spent good money fixing pavement cracks, but as the snow melted many failed fixes were revealed. 


But why did your crack sealant fail so quickly in the first place?

In most cases, the technique used to fill the cracks was substandard.


(Common) Blow & Go – (Not recommended):
Quick and cheap but least effective. Debris / dirt is blown and cracks filled leaving most of the sealant on top 
– vulnerable to being pulled out and scraped off – leaving your pavement further exposed to the elements, traffic and plows, and pedestrians during everyday use. And, once moisture follows down through the cracks and enters a pavement’s base and support structure, the rate of deterioration and damage and cost to repair will accelerate significantly unless you act quickly.



In addition, the sealant that does make it down into the crack has gritty, rough, unprepared surfaces which do not promote optimum bonding surfaces. Either way, sealant will need fixed a lot sooner than you think!

VS

Rout & Flush Pour
– (We recommend):
Quality sealant (Hot applied ASTM 3405 rubberized sealant; proven superior bonding properties, high resiliency – up to 300%, and great cold weather performance) is carefully placed into the routed, dried and prepared crack, filling up from the bottom, until flush with the surface. Voids and bubbles that can shorten the life of the crack seal are eliminated while also preventing most surface damage. This technique also yields and longest “like new” look and attractive appearance.

OR

Rout & Overband – (We recommend for failed repairs):

Effective for crack sealing previously sealed cracks that cannot be routed. Sealant is carefully placed into the dried and prepared crack, filling up from the bottom, and squeegeeing the sealant flush with the surface. This minimizes most damage from traffic, plows, and pedestrians but is less attractive than the Rout & Flush Pour technique.

For best, longer lasting results choose a trusted / knowledgeable expert installer!
It may look like a budget-saver, but as the old adage goes, “You get what you pay for.” You can risk hiring cheaper contractors but if they are not specifically trained in crack sealing, you will have to repeat the process again sooner, wasting your valuable time and money. Choosing a trusted/knowledgeable installer who will use quality products and the right equipment is key to to the long-term performance of any crack seal. We utilize state-of-the-art double jacketed melters designed to safely melt sealant, gently agitate, and then pump it through insulated hoses and specially designed applicators into cracks. We also equip our machines with self contained compressors to blow out oil free compressed air to better prepare cracks for sealant. When properly installed, hot applied crack sealants will last for years to come, protecting your pavement investment. Crack sealing is just one of several integral components in an overall preservation strategy.

Sunday, February 9, 2014

New Branch Office Opens Near Chicago

Thanks to all our clients who are enjoying the benefits and overall cost-savings by preserving their asphalt pavements with us!

Now, just in time for the 2014 working season, we proudly announce the opening of our Chicagoland branch office in Somonauk, IL.

At our new branch office, you can expect the same great Gee quality, pride, and service you have come to expect from us...just now a little closer to you!

Sunday, January 5, 2014

Top New Years Resolutions for Pavement Maintenance

“GSB-88® Sealer Binder cost about 8x less than the cost of applying new asphalt.”
--Matt Hawks, General Manager, White Cloud Casino

“Thank-you for introducing us to a cost-effective and efficient product (GSB-88®)! All airfield users agree it is a great improvement rejuvenating a deteriorated taxiway into an almost new system.”

--Shaun Germolus, Director of Operations, Duluth International Airport

"Analysis shows GSB-88® yields a Savings-To-Investment Ratio (SIR) Of 5.0 and a Return On Investment (ROI) of 400%."

--GSB-88 NAVFAC Performance Report

“$1 spent today on pavement preservation reduces future replacement costs up to $10.80”

– Jim Sorensen, Director Pavement Preservation, FHWA
“Our parking lot was showing signs of deterioration. We needed to improve the appearance and safety. Replacement with new asphalt was going to be costly. We could replace it OR, preserve it by sealing the cracks and applying GSB®. We agreed to have Gee Asphalt Systems provide the pavement preservation services...and are very pleased.

--Matt Hawks, General Manager, White Cloud Casino



“GSB-88® is engineered to significantly retard surface oxidation by rebinding the surface aggregate and protect the pavement binder from the natural surface oxidation process. Surface oxidation is far and away the greatest deteriorating factor on the majority of DOD airfields.”

--DOD Comprehensive Evaluation of GSB-88® Sealer Binder

Thank you for your assistance in providing a solution to our problem...The untreated test section showed extreme raveling with excessive loose aggregate and a very porous surface. The subsequent test application of GSB® has corrected this problem and has no doubt prolonged the life of this surface. It is evident the surface would have to have been replaced if not for the GSB® application.”
--Tom McCarthy, Operations Manager, Northpark Mall



“We are very satisfied with GSB® and over the years of wear and tear it has held up tremendously well. We have used other products over the years but they do not compare to the quality of the GSB® application.”

--Eugene Oakey, Director of Facilities, May Centers, Inc.



“Gee Asphalt showed me pavements where GSB® had been used from as little as 1 year ago, up to pavements maintained as long as 32 years, and they all looked amazing!”

--Brent Stansbury, Facility Engineer, Gateway, Inc.



“We wanted to try something besides the ss1h asphalt emulsions to keep aggregates bound in place on the shoulders, prevent raveling, and keep newly placed asphalt in a "like new" condition. We tried GSB-88®. Years later aggregates were still bound tightly in place...GSB-88® was applied to asphalt overlay projects having ADT (average daily traffic) ranging from 300-2600 vehicles. We will continue using GSB-88® for our asphalt preservation applications.”

--Allen Horak, District Maintenance Superintendent, Nebraska Department of Roads

 “I can’t say enough about Gee Asphalt, their professionalism, polite and courteous staff and customer satisfaction. They talk the talk and walk the walk! You continue to be a true pleasure to work with. Gee Asphalt has become an awesome partner in Asphalt Preservation!" 

--Scott Mallicoat, District Maintenance Supervisor, Farmington Schools

Gee got the job done right!...Working with a company that gets the job done right the first time with little supervision is great! I look forward to working with Gee Asphalt in the future.”


--Les Lawson, Iowa State University, Facilities Planning & Management Campus Services

“From the salesperson to receptionist, owner to crew, these top-notch professionals exceeded our expectations with their fast and efficient, high quality work. Knowledgeable and courteous describes their staff and crew. I would highly recommend them.”


--Ms. Angie Ellison, Engineering Technician, City of Eagan Minnesota

“Everyone at Gee Asphalt Systems, from the owner to office staff to field crews, are professional and act with integrity.  They understand our shopping center clients and work diligently to minimize customer inconvenience."


--Thomas R. Zimmer, PE, Principal, Zimmer Consultants, Ltd

Make Gee part of your New Year's Resolution and improve the health of your pavements today!